Project Performance in Infrastructure Development: Analysis of Time and Quality Control Against Budget Allocation

  • Juanda Universitas Islam Kebangsaan Indonesia
  • Koko Bustami Universitas Islam Kebangsaan Indonesia
  • Muhammad Saifrizal Universitas Islam Kebangsaan Indonesia
Keywords: Infrastructure Development, Time, Quality, Budget

Abstract

Building construction projects often face major challenges related to time management and cost allocation. Cost overruns occur as a result of schedule delays or poor time planning. Managing time well can help reduce cost overruns and improve operational efficiency in construction projects. Project delays often cause additional costs or cost overruns, either due to the use of additional resources or due to the impact of delays on other factors. To determine the magnitude of the influence of Project Performance in Infrastructure Development, the variance extraced for time is 0.646, quality 0.867, budget 0.918, and infrastructure development 0.726, it can be concluded that too much budget is needed to meet rapid development. This cost overrun often has a significant impact on project success, both in terms of finance and the quality of the final result. This occurs due to project delays, which are caused by ineffective time management. In the construction industry, time and cost are two very important and interrelated factors.

References

Abdel-Hamid, M., Mohamed Abdelhaleem, H., 2022. Impact of poor labor productivity on construction project cost. International Journal of Construction Management 22, 2356–2363. https://doi.org/10.1080/ 15623599.2020.1788757
Allmon, E., Haas, C.T., Borcherding, J.D., Goodrum, P.M., 2000. U.S. Construction Labor Productivity Trends, 1970–1998. J. Constr. Eng. Manage. 126, 97–104. https://doi.org/10.1061/(ASCE)0733-9364 (2000) 126:2(97)
Anditiaman Novisca Maria, N., 2022. Model Produktivitas Tenaga Kerja.
Ardian, A.A., 2021. Analisis Perubahan Lingkup Pekerjaan Konstruksi (Studi Kasus Pada Proyek Konstruksi Gedung Pendidikan Universitas Gadjah Mada) (PhD Thesis). Universitas Gadjah Mada.
Arfandi, B.P., Abduh, M., 2021. Pengaruh Pandemi Covid-19 Terhadap Produktivitas Pekerjaan Konstruksi (Tinjauan Analisis Statistik Terhadap Penerapan Protokol Kesehatan), in: Seminar Keinsinyuran Program Studi Program Profesi Insinyur.
Augustine, W., Anondho, B., 2019. Penetapan Kualifikasi Desa Tertinggal Untuk Perencanaan Proyek Konstruksi. JMTS: Jurnal Mitra Teknik Sipil 227–236.
Bakhtiar, A., n.d. Analisa Produktivitas Kelompok Kerja Bangunan Bertingkat Pada Proyek Konstruksi Di Kabupaten Aceh Utara.
Chalil, D., Barus, R., 2014. Analisis Data Kualitatif: Teori dan Aplikasi dalam Analisis SWOT, Model Logit, dan Structural Equation Modeling (Dilengkapi dengan Manual SPSS dan Amos).
Christy, A.V., Widyadana, I.G.A., Budiman, J., 2017. Produktivitas Tenaga Kerja Sebelum Dan Sesudah Perubahan Volume Pada Kontrak Untuk Proyek Pembangunan Apartemen X Dan Hotel Y Di Surabaya. Dimensi Utama Teknik Sipil 4, 31–39.
Dharma, C.A.B., Bara, Y., 2004. Pengaruh dan Hubungan antara Usia, Pengalaman, Pendidikan, dan Upah terhadap Produktivitas Tenaga Kerja pada Pekerjaan Pasangan Batu Bata.
Efrizal, F., 2019. Analisa Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Pada Proyek Perumahan Di Pekanbaru (other). Universitas Islam Riau.
Elizar, E., 2020. Analisis Produktivitas Pekerja Dengan Konsep Value Stream Mapping Pada Pekerjaan Kolom dan Balok. Jurnal Teknik Sipil dan Teknologi Konstruksi 6, 31–40.
Ervianto, W.I., 2005a. Manajemen proyek konstruksi. Andi, Yogyakarta.
Ervianto, W.I., 2005b. Manajemen proyek konstruksi edisi revisi. Yogyakarta: Andi.
Faradina, M.P., 2021. Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pembesian Dan Bekisting MTSN 3 Kota Pekanbaru (PhD Thesis). Universitas Islam Riau.
Faustine, C., Waty, M., 2022. Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi. JMTS: Jurnal Mitra Teknik Sipil 681–692.
Harris, S., Alam, B.P., Wibowo, A.N., 2017. Pengaruh Produktivitas Kerja Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi Bangunan. JURNAL TECNOSCIENZA 2, 53–68.
Henong, S.B., LAKE, R.C., 2019. Analisis Faktor-Faktor Eksternal Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Pekerjaan Pembuatan Batako. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS) 2, 133–140.
Hernandi, Y., Tamtana, J.S., 2020. Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil 299–312.
Hutagalung, G.D.M., 2021. Kajian Faktor-faktor Signifikan Produktivitas Tenaga Kerja Quantity Surveyor Pada Pekerjaan Long Segment Preservasi Di Jalan Simpang Kayu Ara-batas Pelalawan Sikijang Mati-Simpang Lago (PhD Thesis). Universitas Islam Riau.
Ir H Edi Hargono, D.P., MS, I.M., 2017. Analisa Produktivitas Tenaga Kerja Tukang Batu Pada Proyek Pembangunan Gedung Adipadma IIK Bhakti Wiyata Kediri. Sondir 1, 1–9.
Ir H Syamsul Bahri, M.M., Zamzam, H.F., MM, M., 2015. Model penelitian kuantitatif berbasis SEM-Amos. Deepublish.
Irianie, Y., 2004. Analisis Tingkat Pengaruh Motivasi Kerja Terhadap Produktivitas Tenaga Kerja Pada Pelaksanaan Pekerjaan Konstruksi Bangunan Gedung Di Banjarmasin. INFO-TEKNIK 5, 65–72.
Iryani, R., 2021. Pengaruh Lingkungan Kerja, Pemberdayaan Psikologis dan Kepuasan Kerja terhadap Organizational Citzenship Behavior Guru SMK YAPEK Gombong (PhD Thesis). Universitas Putra Bangsa.
Je, K., 2014. Faktor-faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Peningkatan Jalan Raja-Maunori Kabupaten Nagekeo. TEKNOSIAR 8, 25–34.
Junaidi, J., 2021. Aplikasi Amos Dan Structural Equation Modeling (SEM).
Kartika, N., Robial, S.M., Pratama, A., 2021. Analisis produktivitas tenaga kerja pada pekerjaan kolom di proyek pembangunan gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil 3, 103–112.
Kurniawan, A., Priyanto, B., 2023. Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Plesteran Proyek Ruko 2 Lantai. Journal Of Civil Engineering Building And Transportation 7, 163–168.
Leangso, A.S., 2018. Pengaruh Kerja Lembur Terhadap Produktivitas Tenaga Kerja Konstruksi Pada Pekerjaan Balok Dan Plat Lantai (Studi Kasus Proyek Pembangunan Parsley Bakery & Resto Jalan Laksda Adisutjipto Yogyakarta).
Maddeppungeng, A., Asyiah, S., Prasetyo, F., 2022. Pengaruh Kontraktor dan Kondisi Lingkungan Terhadap Bahaya Kesehatan Dan Keselamatan Kerja (K3) Di Proyek The Canary Apartement. Fondasi: Jurnal Teknik Sipil 11, 44–55.
Mandani, T., 2010. Analisis produktivitas tenaga kerja pada pekerjaan pasangan bata (studi kasus proyek pembangunan rumah sakit dr. Moewardi, Surakarta Jawa Tengah).
Maulia, A., Ariansyah, D., Bunyamin, B., 2023. Identifikasi Dampak Pembangunan Konstruksi Pada Masa Covid-19 Di Kota Banda Aceh. PRINCE: Journal of Planning and Research in Civil Engineering 2, 115–126.
Mubarak, M., Bulba, A.T., Yunita, M., 2014. Studi nilai produktivitas pekerjaan pondasi bored pile. Jurnal Teknik Sipil 3, 199–208.
Mukti, M.H., Asmaroni, D., 2020. Faktor-faktor yang mempengaruhi produktivitas tenaga kerja berdasarkan sistem pemberian upah borongan di Kabupaten Sampang (Studi Kasus Pembangunan ICU RSUD Kabupaten Sampang). Jurnal Manajemen Aset Infrastruktur & Fasilitas 4.
Muslim, I., Zainuri, Z., Lubis, F., 2019. Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Dinding Facade (Studi Kasus Pada Proyek Pembangunan Hotel Pop Pekanbaru). Siklus: Jurnal Teknik Sipil 5, 12–22.
Nizar, M., 2016. Analisis Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja Tukang Besi pada PT. Wika Beton Pabrik Produk Beton Pasuruan. IQTISHODUNA: Jurnal Ekonomi Islam 5, 243–276.
Nugroho, D.T., Wibowo, L.R., 2003. Analisis Kualitas Tenaga Kerja Konstruksi Berdasarkan Perilaku yang Berasal Dari Dua Daerah yang Berbeda pada Pekerjaan Pemasangan Batu Bata.
OECD, 2018. Labour productivity forecast. Organisation for Economic Co-operation and Development, Paris.
OECD, 2009. Productivity Measurement and Analysis. Organisation for Economic Co-operation and Development, Paris.
Soeharto, I., 2001. Manajemen Proyek jilid 2 dari Konseptual Operasional. Jakarta: Erlangga.
Tarore, H., 2012. Pengendalian Waktu dan Biaya Pada Tahap Pelaksanaan Proyek dengan Menggunakan Metode Nilai Hasil. Jurnal Sipil Statik, I(44-52), pp. 44-52.
PMBOK, 2013. Project Mnagement Body Of Knowledge Guide. Newtown Square: Project Management Institute, Inc.
A.Roger.(1999).Projectmanagement:cost,timeandquality,twobestguessesanda phenomenon,itstimetoacceptothersuccesscriteria.InternationalJournalofProject Management Vol. 17, No. 6, pp. 337±342. Elsevier Science Ltd and IPMA.
G. Mai Monir & H.Ahmed.(2020).Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management. https://doi.org/10.1080/15623599.2020.1738205
A.O. Daoud et al.(2023). Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects.Alexandria Engineering Journal 83 326–334. Published by Elsevier BV on behalf of Faculty of Engineering,Alexandria University.
M.AslamandE.Baffoe-Twum.(2024).MitigatingscheduleoverrunsinPre-Stressed girder bridge Construction:Assessing risks and proposing mitigation strategies.Ain ShamsEngineeringJournal15102673.PublishedbyElsevierBVonbehalfofFaculty of Engineering, Ain Shams University.
A.A.Chadee,C.AllisandU.Rathnayakeetal.(2024).Dataexplorationonthefactors associatedwithcostoverrunonsocialhousingprojectsinTrinidadandTobago.Data in Brief 52 109966. Published by Elsevier Inc.
W.RobbStewartandK.Shirvan.(2023).Constructionscheduleandcostriskforlarge andsmalllightwaterreactors.NuclearEngineeringandDesign407112305.Published by Elsevier B.V.
N.Adepu et al.(2023).Analyzing the factors affecting construction project schedules amidstCOVID-19pandemic.ProjectLeadershipandSociety4100100.Publishedby Elsevier Ltd.
Arikunto. Suharsimi. 2019. Prosedur Penelitian Suatu Pendekatan Praktik. Edisi Revisi. PT. Rienika Cipta. Jakarta.
K.Andrew, et.al. (2019). Factors influencing Time and Cost Overruns on Freeform Construction Projects. KSCE Journal of Civil Engineering (2019) 23(4):1442-1450. Vol. 23, No. 4 / April 2019.
M. Mulenga, et.al. (2015). Effects of construction projects schedule overruns:Acase of the Gauteng Province, South Africa. Procedia Manufacturing 3 1690 – 1695. Published by Elsevier B.V.
Ahmed Senouci et al. (2016). Time Delay and Cost Overrun in Qatari Public Construction Projects.Procedia Engineering 164 368 – 375. Published by Elsevier Ltd.
H.Phametal. (2020).AssessingtheImpactofCostOverrunCausesinTransmission Lines Construction Projects. KSCE Journal of Civil Engineering 24(4):1029-1036.
Published
2025-08-31
How to Cite
Juanda, Koko Bustami, & Muhammad Saifrizal. (2025). Project Performance in Infrastructure Development: Analysis of Time and Quality Control Against Budget Allocation. Journal Informatic, Education and Management (JIEM), 7(2), 527-535. https://doi.org/10.61992/jiem.v7i2.169