[1]
Juanda, Koko Bustami and Muhammad Saifrizal 2025. Project Performance in Infrastructure Development: Analysis of Time and Quality Control Against Budget Allocation. Journal Informatic, Education and Management (JIEM). 7, 2 (Aug. 2025), 527-535. DOI:https://doi.org/10.61992/jiem.v7i2.169.